A Whale of a Tale

We know that Right Whales are in danger of extinction.

  • As the ocean warms, North Atlantic Right Whales are moving north to cooler waters in unprotected zones, where they die from vessel strikes and entanglement in fishing gear and where their food sources may be scarce.
  • Fewer than 250 mature North Atlantic right whales were estimated to be alive at the end of 2018, with the total population having plummeted by 15% over the last decade.

The factors contributing to the dwindling population of Right Whales include vessel strikes, fishing gear entanglements and lack of food. Climate change is redistributing the crustaceans called copepods that Right Whales eat.

Right Whales are spending more time in Canada than they used to, which is causing serious problems for their conservation.  The deaths since 2017 are largely due to some form of human action, like boat collisions, both in United States and Canadian waters. Quite a few, though not all, of these collisions have happened in the St. Lawrence Estuary in Canada.

But the Right Whale population has also seen low reproductive rates and declining health status in recent years that can’t be explained by vessel impacts. New research points to another possible culprit: climate change.

The Gulf of Maine is warming more rapidly than nearly any other ocean ecosystem on the planet. Scientists think the reasons include changes in the path of the Gulf Stream and the way its warm waters are interacting with other currents in the North Atlantic.

“Deep waters are warming and we think that is having an impact on the life cycle, and the distribution of the critters that right whales eat,” says Pendleton. Those critters – flea-like animals known as copepods, specifically the species Calanus finmarchicus – are a critical food supply for the endangered whales. Read more about this here.

Noise pollution can mask whales’ important underwater communication calls and reduce foraging success, which affects species’ health and reproductive abilities. Ocean noise can also divert the whales from their typical migration paths into areas unsuitable for feeding or into the path of passing ships.

Thus, it is heartening that offshore wind project plans are adopting restrictions, beyond those required by law, on vessel speed and limits on loud turbine construction from pile driving and geophysical survey activities. The limitations take in to account the times when North Atlantic Right whales are unlikely to be in the area.

Given the urgency of the climate crisis, the Natural Resources Defense Council is working hard to advocate for all forms of clean renewable energy projects, including the nascent offshore wind industry.

Local NIMBY groups in East Hampton fighting offshore wind projects, such as the South Fork Wind Farm, are using the plight of Right Whales in a sinister ploy to derail these offshore wind energy projects, which would only worsen ocean warming and the lack of critical food supply for Right Whales. Yet these same groups can not even tell the difference between a Right Whale and a Humpback Whale! See their posters attached in pdf format.

The Wind Farm’s Case

Autor

  • Publication: Southampton Press
  • Published on: Nov 21, 2020
  • Columnist: Karl Grossman

It would be the biggest offshore wind farm in New York State — more than 100 wind turbines starting 30 miles east of Montauk Point. It’s being called Sunrise Wind.

A “cable bundle” containing two electric cables would be buried under the seabed and extended west from the turbines for 100 miles, making landfall in the parking lot at Smith Point County Park in Shirley, and buried underground there. The cabling would then run for 17 miles, all underground, along William Floyd Parkway and, remaining underground, along other roads, and then the Long Island Expressway, reaching the Long Island Power Authority substation just north of the LIE in Holtsville.

Sunrise Wind would generate 880 megawatts of electricity and feed into the Long Island electric grid at Holtsville. The 880-megawatts would provide for 500,000 homes, nearly half of the Long Island Power Authority’s 1.1 million customer base.

A “virtual open house” was held on the project last week. Presentations were made and questions answered by representatives of the owners of the Sunrise Wind project, Denmark-based Ørsted, the world’s largest developer of offshore wind farms, and Eversource, a product of a merger of New England utility companies that included Northeast Utilities.

Ørsted, since acquiring Deepwater Wind, owns the Block Island Wind Farm, consisting of five turbines off Block Island — the first U.S. offshore wind farm, which went operational in 2016. Ørsted and Eversource together own the proposed South Fork Wind Farm, which is to have 15 wind turbines also placed in the Atlantic east of Montauk Point.

The number of wind turbines in the Sunrise Wind project would depend on the size of the turbines used. If 8-megawatt turbines, common in new offshore wind farms, are used, the total would be 110. If the turbines would be smaller then there would be more to produce 880 megawatts of electricity. The project is “permitted for up to” 122 turbines, according to a spokesperson.

New York State last year awarded Ørsted the contract to develop Sunrise Wind after a competitive bidding process.

In the online “virtual open house,” representatives said the Sunrise Wind project would be a “catalyst” for clean energy. Here are some of the other points made by the representatives:

It would be a key to the “transition to clean energy” in New York State and the goal of Governor Andrew Cuomo and the state to have “100 percent clean energy by 2040.”

The turbines would be “barely visible” from any shore. There would be “no harmful emissions,” and Sunrise Wind would “displace 2.1 million metric tons of carbon pollution” every year.

The “cost to the average ratepayer” on Long Island would be “less than $1 per month” extra on her or his electric bill. “Construction work could begin as early as 2023” — after all necessary permits are obtained — and completed in 2024.

There’d be a “host community benefit agreement,” through which Ørsted and Eversource would provide funds. Suffolk County Community College would become the “training center in Suffolk County” for offshore wind technology. It would be the “academic arm of the initiative.”

Port Jefferson would become a “hub” for activities. Workers on the Sunrise Wind project would live in two-week shifts on a “service operational vessel.”

Ørsted “brings unparalleled expertise” to the project, with its 26 “successful offshore wind farms” and “1,500 turbines worldwide.”

Cables would be buried “the entire length of the route.” All the “construction areas” would be “fully restored.” There would be “minimal environmental impact.”

Ørsted and Eversource welcome “stakeholder suggestions.” A slogan of “we listen, we learn, we adjust” was displayed. “We are totally committed to protect the environment … and work with commercial and recreational fishing interests.”

As to why the South Fork Wind Farm and the Sunrise Wind project would have different landing points, the explanation was that the South Fork project would be sending DC electricity to Long Island, and Sunrise would be sending AC. Also, there would be a difference in the voltage sent.

Offshore wind farms are able to harvest more wind power than onshore wind projects, said the representatives. Wind isn’t blocked and turbines can be larger, it was explained.

They said Sunrise Wind would be a “game-changer,” the “first of many” similar “large-scale” U.S. offshore wind projects. Also, offshore wind is an excellent “complement” to the other major source of clean electricity — solar power.

The big ugly barge…

SOUTH FORK WIND – Field Surveys & Site Evaluation Purpose.

South Fork Wind is performing nearshore geotechnical surveys to inform the cable landing. The work will be performed by a lift boat named the Laredo Brazos – a barge that can stand out of the water for protection from wave action. The surveys will consist of three soil borings of the seafloor. The soil borings will be taken at points 780 feet, 1470 feet, and 2,160 feet from shore, directly off the Wainscott Beach.

Timeline: The vessel is anticipated to arrive on or around November 15 and activity will begin on November 16. We anticipate the work will be completed by November 25. The barge, as well as a smaller vessel named the Kristen Miller, will be visible from shore during this time. Timeline & Location

Email: info@southforkwind.com

Website: southforkwind.com

Twitter@SouthForkWind

Union Labor for Offshore Wind

Submitted by Judith Weis:

Ørsted Works to Bring More Union Labor to Offshore Wind

November 20, 2020

Block Island wind farm. Image: Wikimedia commons

On Wednesday11/18/20, Danish energy company Ørsted joined with North America’s Building Trades Unions (formerly known as the AFL-CIO’s Building and Construction Trades Department) to create a program that trains wind energy workers in hopes of deploying more offshore wind along the East Coast.

In doing so, these groups have piloted a new way to create more carbon-free energy while also expanding job opportunities and training to workers in a rapidly growing sector of our economy. 

Why This Matters: Some labor unions haven’t always embraced a transition to a clean energy economy fearing that such a transition would wipe out high-paying jobs in existing energy and industrial sectors and replace them with lower-wage alternatives. Yet this program strives specifically to bring labor unions on board to help grow the nascent U.S. offshore wind industry. 

As it stands, the United States is lagging behind Europe and Asia in maximizing its offshore wind energy capacity. Europe has 22,000 megawatts of offshore wind capacity, Asia has 8,000, while the United States only has just over 40–it’s a chance to reduce emissions while creating jobs. 

A New Energy Sector: Ørsted operates a wind farm off Block Island — America’s first utility-scale offshore wind farm, and has also built a two-turbine project off the coast of Virginia. The Rhode Island project was built with union labor and served as a pilot for a more sweeping national agreement.

To expand this program, Ørsted and NABTU will select the necessary skills to create an offshore workforce as well as a training and certification program to prepare potential workers to construct new wind energy projects.

The United States has 15 active commercial leases for offshore wind farms. According to statistics from the America Wind Energy Association, if these farms were constructed, they could generate 30 gigawatts of electricity, create 83,000 jobs, and bring in 25 billion dollars in annual economic output over the next ten years.

Moreover, it’s important that Ørsted is working alongside labor unions to ensure fair wages and benefits. NABTU’s president supports the agreement, telling Reuters: “This will show how as we move and transform our energy production in North America, it can be done at middle-class wages and good benefits packages. Anything else is not acceptable.”